Start-up of the OTTO JUNKER melting plant MFT 2x4000 tons at JSC TWP
- Customer : JSC Tverskoy wagon building plant
- Project started : 13.12.2012
13 of December 2012, the JSC Tverskoy wagon building plant (Tver, CJSC TRANSMASHHOLDING) started-up a melting plant produced by OTTOJUNKER (Germany) type 2MFTGe 4000-SC-DUOMELT.
Melting plant consist of 2 crucible furnaces with a capacity 4000 kg each, with an independent power supply 3000 kW, with closed circuit cooling system, as well as with 2 charging devices for automatic charging of the scrap. For the operation of the furnaces, the DUOMELT power distribution system with a common furnace cooling circuit is used, which allows to smoothly distribute energy between the furnaces using all the potential inherent in the equipment.
Other projects
-
JSC Tutaevsky Motor Plant
Modernization of sand plant for 100 tons per hour at JSC TMZ
Project started : 14.09.2020Modernization of sand plant for 100 tons per hour at JSC TMZ
Look -
JSC Transpnevmatika
Start up of new STEM shot blasting machine at JSC Transpneumatika
Project started : 19.01.2018Start up of new STEM shot blasting machine at JSC Transpneumatika
Look -
JSC Bezhitskaya Steel
Start up of the 1st phase at JSC Bezhitskaya Steel of the new STEM shot blasting equipment
Project started : 04.06.2019Start up of the 1st phase at JSC Bezhitskaya Steel of the new STEM shot blasting equipment
Look