Modernization of sand plant for 100 tons per hour at JSC TMZ
- Customer : JSC Tutaevsky Motor Plant
- Project started : 14.09.2020
In 2020, as part of the program to improve production efficiency at JSC Tutaevsky Motor Plant, the sand preparation plant of the foundry was modernized. As part of the complex, modern KUTTNER SAVELLI mixers with a total capacity 100 tons of green sand per hour were installed.
As a result of modernization, JSC TMZ received a stable sand mix, reduced cycle time, and significantly reduced the number of personnel. The equipment works fully automatically. Now only 1 operator works in this area, with main task only to monitor the parameters on the control panel.
The modern KUTTNER SAVELLI complex is equipped with a moisture control system "AQUATEST", and with the help of the "SANDCONTROL" system, a check is carried out for the compaction and compression of the sand mix.
The new equipment was integrated into the existing production chain of JSC Tutaevsky Motor Plant practically without stops in production process.
Chief metallurgist of JSC Tutaevsky Motor Plant Mr. Balantsev S.A: "Installation of new equipment contributes to an increase in the output of metallurgical production, to improve the quality and reduce the cost of production."
Other projects
-
JSC Tverskoy wagon building plant
Start-up of the OTTO JUNKER melting plant MFT 2x4000 tons at JSC TWP
Project started : 13.12.2012Start-up of the OTTO JUNKER melting plant MFT 2x4000 tons at JSC TWP
Look -
JSC Transpnevmatika
Start up of new STEM shot blasting machine at JSC Transpneumatika
Project started : 19.01.2018Start up of new STEM shot blasting machine at JSC Transpneumatika
Look -
JSC Bezhitskaya Steel
Start up of the 1st phase at JSC Bezhitskaya Steel of the new STEM shot blasting equipment
Project started : 04.06.2019Start up of the 1st phase at JSC Bezhitskaya Steel of the new STEM shot blasting equipment
Look