12.03.2018 induction melting complex OTTO JUNKER (Germany) was started up at JSC Kushva Roll Manufacturing Factory (Kushva).
Melting plant type 2MFT Ge 16.000 / 6.100 kW / 150 Hz, DUOMELT. The complex consists of 2 crucible furnaces with a capacity of 16 tons each, the power of converter of the complex is 6.1 MW. With the commissioning of the new OTTO JUNKER (Germany) melting complex, the productivity of the melting site at JSC KRMF was increased in 2 times. For the operation of the furnaces, the DUOMELT power distribution system with a common furnace cooling circuit is used, which allows to smoothly distribute energy between the furnaces using all the potential inherent in the equipment.
Other projects
-
JSC Tutaevsky Motor Plant
Modernization of sand plant for 100 tons per hour at JSC TMZ
Project started : 14.09.2020Modernization of sand plant for 100 tons per hour at JSC TMZ
Look -
JSC Tverskoy wagon building plant
Start-up of the OTTO JUNKER melting plant MFT 2x4000 tons at JSC TWP
Project started : 13.12.2012Start-up of the OTTO JUNKER melting plant MFT 2x4000 tons at JSC TWP
Look -
JSC Transpnevmatika
Start up of new STEM shot blasting machine at JSC Transpneumatika
Project started : 19.01.2018Start up of new STEM shot blasting machine at JSC Transpneumatika